A Week at the (mis)Adventures project

I usually don’t post until I have something done – but as the weather gets better it seems projects are happening in the basement, first floor, upstairs and outside at the same time.1 new lightIn the living room I debated what light fixture to use in the center of the room. I had this 25″ stained glass lamp in my present home so I popped it in here to see how it would look. I also added a ceiling medallion that is the same diameter.

14 door handleThe bead design in the medallion matches the detail in the door plates.

2 living roomThe fixture has white and green stained glass with clear cabochon jewels. I like the fact that the shape of the shade and colors mirror the ginkgo windows. I’ll put whiter LED bulbs in the fixture. I looks yellow because of the old tungsten bulbs. But not 100%  sure. What do you think? Should I keep this or go with a traditional crystal chandelier?

3 sub panelDown to the basement – I added a new sub panel for the basement circuits. I’ll wire all the basement electric to this panel. The original just didn’t have enough spaces for the steam shower and other stuff down here. Also the egress window is shown ready for installation – as soon as I cut the window hole in the foundation. And that black cast iron waste pipe is gonna go too – as soon as I dig a pit for the pipes outside. It’s always something…

4 roofing in progressAnd the one rain free day (yesterday) the old roof was torn off.

6 New RoofAnd the new roof went on. Finally the roof is on and I can start on the final details and siding outside.

5 Alpha Omega ContractingI have worked with a lot of contractors on this project. I do most of the work around here – but have sub contracted the plumbing and foundation work in the past – some with not too great results. For the roofing for my home and the Gallery, I chose my friend Bill Combs with Alpha-Omega Contracting to do my roofs. I want to highly recommend him for any project. I think those that follow along will know how particular I am with everything dealing with this house, and Bill was even more demanding that every element was well done. I should know, as I was on the roof too. I can’t thank him enough for putting up with my specific demands of my special copper chimney flashings and my newly installed Azek trim shows barely a scratch. When the crew was done you couldn’t tell they were ever there. So a big A+ for Alpha-Omega Contracting.

Lets hope the rest of this renovation goes as smoothly.